Finish a basement bathroom (ongoing)

Finishing third basement bathroom is more of a challenge due to the pre-roughed in floor drains and finished wall.

The trap was installed after some basic excavation down.

Drain & overflow required a Y to run the line left.

Drain & overflow – got it all tied together
Tub installed, acrylic deep soaker.
Full bath water shut-offs with Pex & push and bite type plumbing. Makes life easy & done in no time.
Roughed in plumbing done & drywall underway.
Hang drywall & finishing the bulkheads
Bulkheads are a bit of a gong show. 6 Horizontal & 8 vertical, 22.5 & 45 degree angles, around duct work & plumbing.
Cork flooring & toilet installed